Safety Checklist Form Template

Instantly Create Your Checklist, Just enter your details

Shower Installation Safety Checklist

Use our Checklist creator tool to create customised workplace safety documents. Learn more about Shower Installation Safety Checklist Template below
Safety Checklist Creator
Guest

Loading Safety Checklist Creator

Please wait while we prepare your workspace

Checklist Questions

Every question is included by default. Untick any you want to leave out, or delete the ones you don't need.

Click Add Question to add your own custom checks. Click a row to edit its wording, and drag to reorder.

The Yes / No / N/A tick-boxes and comments space are added automatically on the exported PDF or Word document.

No questions added yet — add your first one below.

Logo, Branding & Sign-off

Company brandingStandard+

Upgrade to add your company logo and brand colours, and customise how your documents look.Available on our Standard and Pro plans.

Add my branding →

Sign to confirm you completed this checklist

Click to sign on behalf, or leave blank for on-paper approval.

Review & Export

Your checklist is ready. Register free to download your PDF — it opens in a new tab and signs you in here automatically, so don't refresh or leave this page.

Export

Preview checklist
See exactly how it looks before downloading.
Download PDF .PDF
Register a free account to download — takes seconds, your checklist stays right here.
Download Word .DOC Standard & Pro
An editable Word (.doc) version — upgrade to unlock.
Export to Excel Coming soon
A spreadsheet version for digital tracking and filtering.

Save & share

Save to account Not saved
Sign in to save and manage your checklists.
Manage checklist
Sign in to manage, edit and re-export this checklist.
Save first, then manage, edit and re-export it here.
Manage, edit and re-export your saved checklist.
Create a RAMS pack
Sign in to bundle saved documents into a pack.
Save first, then merge saved documents into one pack.
Merge saved documents into one cover + contents pack.
Sign in Create
Share & sign
Not available for checklists — each checklist carries its own printed sign-off section instead.

How sharing & packs work

RAMS packs (Site Packs)

All plans

Bundle multiple saved documents into a single deliverable pack — a cover page + table of contents + all member document PDFs merged into one professional export.

  • Cover page + table of contents
  • All member PDFs merged into one
  • Share via one secure link
  • Recipients sign once for the whole pack

Share the pack with a customer or workforce — recipients review each document and sign once to acknowledge receipt of the entire pack.

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

PDF Preview

100%

Creating preview

Building your PDF preview…

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Risk Assessment Description:

This shower installation safety checklist template assists plumbers, heating engineers and Gas Safe registered engineers in confirming that all safety steps are taken before, during and after fitting a new shower.

It covers planning, competence, site conditions, task‑specific hazards, tools and equipment, substances, personal protective equipment, collective safety measures, emergency provisions and final make‑safe checks. It references Building Regulations Part G (Water Services) 2021, the Health and Safety at Work etc Act 1974, HSE legionella guidance and HSE scalding and burning guidance. The checklist is designed for use on domestic or commercial properties and aligns with the statutory duties of duty‑holders.

Use this checklist for:

  • Pre‑start checks – verify risk assessment, permits and water shut‑off.
  • In‑process checks – confirm safe handling of hot water, tools and fittings.
  • Completion sign‑off – test for leaks, correct temperature and record handover.

Tick Yes, No or N/A for each item; any No response must be addressed before proceeding. The document can be printed, filled in on‑site and stored as part of the project records.

The checklist should be completed on site by the appointed competent person, with any non‑conformities recorded and corrective actions taken before work resumes. It forms part of the project documentation required for Building Control approval and for maintaining compliance with the relevant regulations.

Fully editable and shareable – customise the questions to your site, download as a PDF and share with your team.

Compliant with: Building Regulations Part G (Water Services) 2021; Health and Safety at Work etc Act 1974; HSE legionella guidance; HSE scalding and burning guidance.

Sample PDF Document Image:

Checks covered in this Shower Installation checklist

This Shower Installation safety checklist template covers 26 checks. Customise the questions to your workplace, then download a professional, print-ready PDF with Yes / No / N/A tick-boxes and a comments space.

#Checklist item
1Has a risk assessment and method statement for the shower installation been completed and briefed to the operatives?
2Is the plumber or heating engineer qualified, competent and, if gas is involved, Gas Safe registered?
3Are all necessary permits (e.g., temporary water shut‑off) obtained and recorded?
4Is the work area clear of unnecessary items and has adequate lighting been provided?
5Is the area well ventilated to prevent build‑up of steam and gases?
6Is the water supply isolated and the mains shut‑off valve clearly identified?
7Are the correct pipe sizes, materials and fittings identified and verified against the design?
8Are all tools and power equipment in good condition, with guards intact and no visible damage?
9Is a suitable pipe cutter or saw being used for the pipe material and is it in good condition?
10Are cleaning chemicals or adhesives stored safely and used according to manufacturer instructions?
11Is appropriate PPE – safety glasses, gloves, slip‑resistant boots and hearing protection – being worn?
12Is a fire extinguisher of suitable class readily accessible on site?
13Are barriers or signage in place to protect other occupants from the work zone?
14Is hot water temperature set to a safe level (≤ 48°C) to prevent scalding?
15Are pipe joints and connections tightened to the correct torque and checked for leaks after installation?
16Is the drainage system correctly connected and free of blockages?
17Is the finished shower tested for water flow, temperature control and proper drainage?
18Has the work area been cleared of debris and waste material after completion?
19Are all records – risk assessment, test results and handover documents – completed and signed?
20Is a first‑aid kit available and have operatives been briefed on emergency procedures?
21Is the thermostatic mixing valve installed and set to the correct temperature limit?
22Is the water pressure within the manufacturer’s recommended range for the shower unit?
23If the shower is gas‑fed, is the gas supply valve isolated, connected with approved pipework and tested for leaks?
24Is the electrical supply to an electric shower protected by an RCD and correctly earthed?
25Are all pipe insulation and lagging installed around hot water supply to prevent heat loss and scald risk?
26Is the shower head securely fixed and free from damage?

Frequently asked questions

Are these safety checklist templates really free to download?

Yes — completely free. Customise any checklist to your workplace and download a professional, print-ready PDF in minutes. No paywall — a free account is all you need to download.

What format do the safety checklists download in?

Checklists download as a professional PDF, ready to print and complete on-site — each question has clear Yes / No / N/A tick-boxes and a comments space. You choose portrait or landscape at download. Word and spreadsheet formats are being added.

Can I customise the checklist questions to my workplace?

Yes — fully. Add your own questions, edit or remove any of the pre-written ones, and reorder them to suit your site, task or inspection before you download.

Are the safety checklists suitable for UK workplaces?

Yes. The checklists are written around UK health and safety good practice and HSE guidance, and are suitable for inspections, audits, toolbox checks and routine workplace monitoring.

Do I need an account to use the checklist templates?

You can build and preview a checklist without an account. To download the PDF you'll need a free account — it takes less than a minute, costs nothing, and also lets you save checklists to your dashboard and edit them later.

Can I add my company logo and branding to the checklist?

Yes — add your company logo, colours and details on Standard and Pro plans, so the exported checklist carries your own branding. Guests and Free downloads carry Health & Safety Zone branding.

How do I complete the checklist once it is downloaded?

The exported checklist is a blank, ready-to-use document: print it and tick Yes, No or N/A against each question and write any comments in the notes space, then sign and date it in the sign-off section.

What types of safety checklist can I create?

We are building specialist checklists across a wide range of subjects and industries — fire safety, workplace inspections, equipment and machinery checks, site inductions, vehicle checks, PPE, first aid and more. Browse by category to find the right one.

How often should safety checklists be completed?

It depends on the activity and your risk assessment — many checks are daily, weekly or monthly, while others are done before each task or shift. Completed, dated checklists provide a useful record of your monitoring.

Are the checklists a substitute for a risk assessment?

No. A checklist is a monitoring and inspection tool that complements your risk assessments and method statements — it helps confirm that controls are in place and working. Use them alongside your risk assessments.