Safety Checklist Form Template

Instantly Create Your Checklist, Just enter your details

Electric Shower Installation Safety Checklist

Use our Checklist creator tool to create customised workplace safety documents. Learn more about Electric Shower Installation Safety Checklist Template below
50% off your first month Standard £4.99 · Pro £12.49 for month one — applied automatically. Ends 31 July Claim offer
Safety Checklist Creator
Guest

Loading Safety Checklist Creator

Please wait while we prepare your workspace

Checklist Questions

Every question is included by default. Untick any you want to leave out, or delete the ones you don't need.

Click Add Question to add your own custom checks. Click a row to edit its wording, and drag to reorder.

The Yes / No / N/A tick-boxes and comments space are added automatically on the exported PDF or Word document.

No questions added yet — add your first one below.

Logo, Branding & Sign-off

Custom Branding Not Available

Create a free account, then upgrade to add your company logo.

Sign to confirm you completed this checklist

Click to sign on behalf, or leave blank for on-paper approval.

Review & Export

Choose your page orientation, then export a print-ready checklist.

Preview Document

See exactly how your checklist PDF will look before downloading.

Download PDF

Print-ready PDF with Yes / No / N/A tick-boxes and a comments space.

Export to Word

An editable Word (.doc) version with Yes / No / N/A tick-boxes and a comments space.

Export to Excel

A spreadsheet version for digital tracking and filtering.

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

PDF Preview

100%

Creating preview

Building your PDF preview…

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Risk Assessment Description:

This electric shower installation safety checklist from Health & Safety Zone helps electricians, electrical installers and supervisors confirm that an electric shower is installed safely and complies with the BS 7671 (IET Wiring Regulations) and the Electricity at Work Regulations 1989. It is designed for use before work starts, during installation, and on completion of the job.

The checklist covers all key safety dimensions: planning and documentation, competence and training, safe work environment, specific electrical hazards and controls, equipment and tools, personal protective equipment, collective safety measures, emergency arrangements and final make‑safe verification. It references the required statutory regulations and HSE guidance throughout.

Use this checklist for:

  • Pre‑installation checks – verify isolation, risk assessment and competence before any work begins.
  • During‑installation verification – confirm each electrical test and protective device is correctly installed.
  • Post‑installation sign‑off – ensure the shower is safe to use and records are complete.

Each item is answered Yes, No or N/A. Any No answer must be rectified before the shower is commissioned. Record the outcome and any corrective action taken.

Fully editable and shareable — customise the questions to your site, download as a PDF and share with your team.

Compliant with: BS 7671 (IET Wiring Regulations); Electricity at Work Regulations 1989.

Sample PDF Document Image:

Checks covered in this Electric Shower Installation checklist

This Electric Shower Installation safety checklist template covers 26 checks. Customise the questions to your workplace, then download a professional, print-ready PDF with Yes / No / N/A tick-boxes and a comments space.

#Checklist item
1Has a suitable risk assessment and method statement for the electric shower installation been prepared and briefed to the operatives?
2Is the installer qualified and competent to carry out low‑voltage electrical installations in accordance with BS 7671?
3Has the supply to be used been isolated and verified dead before any work starts?
4Is the isolation verification performed using a calibrated voltage tester and documented?
5Are all tools and test equipment (insulation tester, RCD tester, continuity tester) calibrated and in good condition?
6Is the correct RCD type and rating provided for the shower circuit as required by BS 7671?
7Is the circuit protected by an appropriately rated MCB or fuse in line with the design calculations?
8Is the earthing conductor installed and securely connected to the consumer unit earth bar?
9Has the earth continuity of the shower's metal parts been tested and shown to be ≤ 0.2 Ω?
10Has the insulation resistance of the supply conductors to the shower been measured and shown to be ≥ 1 MΩ?
11Is the polarity of the live and neutral conductors verified at the shower connection?
12Is the cable type, size and routing suitable for the installation and protected against mechanical damage?
13Are any concealed cable routes inspected for damage and protected with appropriate trunking or conduit?
14Is the shower's thermal cut‑out device fitted and correctly set according to the manufacturer’s instructions?
15Are all exposed live parts within the required clearance distances as per BS 7671?
16Is the work area dry, well‑lit and free from combustible material?
17Is the installation area adequately insulated from moisture and has suitable access and lighting for safe electrical work?
18Is adequate ventilation provided to prevent steam accumulation and ensure safe operation of electrical equipment?
19Is the work area free from water ingress and slip hazards, ensuring a safe environment for electrical work?
20Is suitable PPE (insulated gloves, safety glasses, flame‑resistant clothing) being worn by the installer?
21Are appropriate fire‑extinguishing equipment and first‑aid provisions available nearby?
22Is a suitable means of emergency isolation (e.g., RCD or isolator) accessible and tested?
23Is the circuit correctly labelled with voltage, function and protective device information?
24Is the shower's water inlet pipe insulated or protected to prevent overheating?
25Has the completed installation been tested for functional operation and correct temperature control?
26Is a final verification certificate signed and filed, confirming compliance with BS 7671 and the Electricity at Work Regulations 1989?

Frequently asked questions

Are these safety checklist templates really free to download?

Yes — completely free. Customise any checklist to your workplace and download a professional, print-ready PDF in minutes. No paywall, and no signup required for guests.

What format do the safety checklists download in?

Checklists download as a professional PDF, ready to print and complete on-site — each question has clear Yes / No / N/A tick-boxes and a comments space. You choose portrait or landscape at download. Word and spreadsheet formats are being added.

Can I customise the checklist questions to my workplace?

Yes — fully. Add your own questions, edit or remove any of the pre-written ones, and reorder them to suit your site, task or inspection before you download.

Are the safety checklists suitable for UK workplaces?

Yes. The checklists are written around UK health and safety good practice and HSE guidance, and are suitable for inspections, audits, toolbox checks and routine workplace monitoring.

Do I need an account to use the checklist templates?

No — guests can build and download a checklist for free without signing up. Register a free account if you want to save checklists to your dashboard and edit them later.

Can I add my company logo and branding to the checklist?

Yes — add your company logo, colours and details on Standard and Pro plans, so the exported checklist carries your own branding. Guests and Free downloads carry Health & Safety Zone branding.

How do I complete the checklist once it is downloaded?

The exported checklist is a blank, ready-to-use document: print it and tick Yes, No or N/A against each question and write any comments in the notes space, then sign and date it in the sign-off section.

What types of safety checklist can I create?

We are building specialist checklists across a wide range of subjects and industries — fire safety, workplace inspections, equipment and machinery checks, site inductions, vehicle checks, PPE, first aid and more. Browse by category to find the right one.

How often should safety checklists be completed?

It depends on the activity and your risk assessment — many checks are daily, weekly or monthly, while others are done before each task or shift. Completed, dated checklists provide a useful record of your monitoring.

Are the checklists a substitute for a risk assessment?

No. A checklist is a monitoring and inspection tool that complements your risk assessments and method statements — it helps confirm that controls are in place and working. Use them alongside your risk assessments.