Instantly Create Your Method Statement, Just enter your details
Generating your document and preparing download...
Please wait while we prepare your workspace
You've used today's free document. A free account gives you more every week — plus save, reuse and team sign-offs.
1 of 1 free document used today
Free forever — upgrade only if you need to.
No card needed · takes about 30 seconds
You'll create your account first, then continue
Compare all access optionsPlease log in to manage your saved documents.
Please wait while we process your request
You have a saved version of this document. Pick up where you left off, or start a new one.
Company brandingStandard+
Upgrade to add your company logo and brand colours, and customise how your documents look.Available on our Standard and Pro plans.
Your logo, header theme and accent colour appear on every document you generate. Changes save to your Branding profile.
Using HSZ default — upload a PNG or JPG to replace.
No logo leaves the header logo area blank.
Dark gives the strongest contrast for most logos.
Set the accent to match your logo
The colour picker has an eyedropper to grab the exact shade.
Colours are automatically synced with your Branding settings.
Heads up: saving here restyles headers on every document across your account.
Sign to confirm you have approved this document
Export
Save & share
How sharing & packs work
Turn a saved document into proof of a briefed workforce — send a secure link and your team signs to confirm they've read and understood it.
Shared pages carry Health & Safety Zone branding — upgrade to Standard/Pro to use your own logo & colours.
Bundle multiple saved documents into a single deliverable pack — a cover page + table of contents + all member document PDFs merged into one professional export.
Share the pack with a customer or workforce — recipients review each document and sign once to acknowledge receipt of the entire pack.
PLEASE WAIT DO NOT CLOSE THIS PAGE
YOUR DOCUMENT IS BEING GENERATED
Building your PDF preview…
Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.
Increased Limits Available
This laboratory cleaning method statement template from Health & Safety Zone is designed for specialist cleaning technicians, cleaning business owners and supervisors who need a clear, compliant safe system of work for cleaning school, college, university, commercial and pathology laboratories.
It covers the main hazards of cleaning in a laboratory, including contact with biological material and spills, cleaning chemicals, wet floors and manual handling of bins and equipment, and sets out the process in the order the work is done.
Use this method statement for:
The template sets out the introduction and legal framework, the training and competence needed, a scope of works broken into stages, step-by-step planning for each stage, the personal protective equipment to use and the finishing checks, ready for your team to expand with site-specific detail. It makes clear that cleaners never touch samples, chemicals, gas cylinders, biological safety cabinets or laboratory equipment, and that laboratory waste is left for laboratory staff.
Fully editable and shareable, it can be tailored to your site, branded with your company details and shared with your workforce for sign-off before work begins.
Compliant with: Health and Safety at Work etc. Act 1974, Management of Health and Safety at Work Regulations 1999, Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013, Health and Safety (First-Aid) Regulations 1981, Workplace (Health, Safety and Welfare) Regulations 1992, Provision and Use of Work Equipment Regulations 1998, Manual Handling Operations Regulations 1992, Personal Protective Equipment at Work Regulations 1992, Control of Substances Hazardous to Health Regulations 2002, Electricity at Work Regulations 1989, Health and Safety (Safety Signs and Signals) Regulations 1996, Environmental Protection Act 1990, Waste (England and Wales) Regulations 2011.
| Safety Checklist | Science Laboratory Inspection Safety Checklist for Schools and Learning Environments | Create |
| Risk Assessment | Laboratory Out-of-Hours Risk Assessment | Create |
| Risk Assessment | Secondary Science Laboratory Risk Assessment | Create |
| Risk Assessment | Laboratory Chemical Storage Risk Assessment | Create |
| Toolbox Talk | Laboratory and Bunsen Burner Safety Toolbox Talk | Create |