Method Statement Template Generator

Instantly Create Your Method Statement, Just enter your details

Drainage Installation and Repair Method Statement

Use our method statement generator to create customised workplace safety documents. Learn more about Drainage Installation and Repair Method Statement Template below
Signature Limits Increased for Free Users

Due to increased demand and interest in our digital signatures and sign-off reports feature, we've increased the signature limit from 20 to 100 per shared document for free registered users. This gives you much more flexibility to share your documents, collect digital signatures from team members, stakeholders, and create comprehensive sign-off reports. Try it now!

Company:
Issue:
Approved:
Ver:

Loading Document Generator...

Please wait while we prepare your workspace

Go Digital with Electronic Signatures: Once you've saved your document, visit My Documents to create a secure share link. Distribute it across any platform (WhatsApp, Email, SMS) to collect encrypted digital signatures from your workforce and generate professional sign-off reports.

loading...

PLEASE WAIT DO NOT CLOSE THIS PAGE
YOUR DOCUMENT IS BEING GENERATED

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Testing with increased limits

Method statement Description:

Drainage Installation and Repair Method Statement: Ensuring Safe and Compliant Drainage Works

The Drainage Installation and Repair Method Statement is an essential document for projects involving new drainage systems, pipe repairs, sewer connections, and surface water management. It provides a structured safe system of work, ensuring compliance with UK health and safety regulations, including the Construction (Design and Management) Regulations 2015 (CDM 2015), the Confined Spaces Regulations 1997, and the Provision and Use of Work Equipment Regulations 1998 (PUWER).

Why is a Drainage Installation and Repair Method Statement Important?

Drainage works present multiple risks, including excavation collapse, confined space hazards, water ingress, and exposure to hazardous substances. A structured method statement helps to:

  • Identify hazards and implement control measures for excavation safety, manual handling, and confined space entry
  • Ensure compliance with HSE regulations and industry best practices
  • Define step-by-step procedures for installing, repairing, and testing drainage systems
  • Assign responsibilities to the Site Supervisor, Drainage Operatives, and Safety Inspectors
  • Outline emergency procedures, including flood prevention, trench collapse response, and hazardous gas exposure protocols

Key Features of Our Drainage Installation and Repair Method Statement Template

  • Comprehensive Risk Assessment – Covers excavation safety, confined spaces, water hazards, and pipe handling
  • Step-by-Step Safe Work Procedures – Includes ground preparation, pipe laying, joint sealing, testing, and backfilling
  • Legal Compliance – Fully aligned with CDM 2015, Confined Spaces Regulations 1997, PUWER 1998, and HSG47 (Avoiding Danger from Underground Services)
  • Customisable and User-Friendly – Easily adaptable for various drainage works, including sewer repairs, stormwater systems, and foul drainage installations

Streamline Compliance with Our Online Document Generator

Creating a HSE-compliant Drainage Installation and Repair Method Statement is quick and easy with our online document generator. Simply enter your project details, and generate a professional, legally compliant document in minutes, saving time while ensuring worker safety and project efficiency.

Useful Resources and Links

For further guidance on drainage safety and compliance, refer to:

Sample PDF Document Image:
Frequently Asked Questions: