Free Method Statement Templates

Explore our extensive collection of templates to create tailored method statements.

Free Method Statement Templates for Safe and Compliant Workplaces

Ensure workplace safety, legal compliance, and risk management with our FREE Method Statement Templates. Unlike basic templates with empty fields, our documents are professionally drafted, fully structured, and ready for customisation and editing. Designed for construction, manufacturing, and high-risk industries, each template provides clear, HSE-compliant guidance on work procedures, hazard identification, and control measures. With integrated Risk Assessment and Method Statements (RAMS), our templates help businesses streamline safety documentation and meet regulatory requirements. Download and customise your method statement templates today!

Complete your RAMS – You can create a FREE Risk Assessment using our risk templates HERE

TypeDocument TitleAction
Method StatementFREEPDFAbove-Ground Soil and Waste Pipework Installation Method StatementDownload a soil and waste pipework method statement: route set-out, fixing supports, solvent weld and push-fit joints, stack connections, valves and testing.Category: Plumbing
Method StatementFREEPDFAir Source Heat Pump Installation Method StatementDownload an air source heat pump installation method statement: survey and siting, base and mounting, hydraulic connections, cylinder and commissioning.Category: Plumbing
Method StatementFREEPDFBackflow Prevention Device Installation and Testing Method StatementDownload a backflow prevention device method statement: fluid category checks, isolation, fitting the device, commissioning and testing RPZ valves.Category: Plumbing
Method StatementFREEPDFBall Valve and Float Valve Replacement in Storage Cisterns Method StatementDownload a ball valve replacement method statement: loft access, isolating and draining, fitting the valve, setting the level, checking for leaks.Category: Plumbing
Method StatementFREEPDFBath and Shower Tray Resealing Method StatementDownload a bath resealing method statement: protecting the area, removing old sealant, treating mould, drying the joint, applying new sealant, curing.Category: Plumbing
Method StatementFREEPDFBiomass Boiler Installation Method StatementDownload a biomass boiler installation method statement: siting and flue survey, positioning the boiler, flue and chimney, thermal store and commissioning.Category: Plumbing
Method StatementFREEPDFBiomass Boiler Servicing and Maintenance Method StatementDownload a biomass boiler servicing method statement: shutdown and isolation, ash removal, cleaning, fuel feed checks, flue sweeping, combustion checks.Category: Plumbing
Method StatementFREEPDFBlocked Sink, Basin and Toilet Clearing Method StatementDownload a blocked sink and toilet clearing method statement: assessing the blockage, isolating appliances, clearing the waste, testing flow, disinfecting.Category: Plumbing
Method StatementFREEPDFBurst and Frozen Pipe Repair Method StatementDownload a burst and frozen pipe repair method statement: isolating water and electrics, draining down, safe thawing, repair, refilling and lagging.Category: Plumbing
Method StatementFREEPDFCCTV Drainage Survey Method StatementDownload a CCTV drainage survey method statement: chamber access, barriers, lifting covers, push-rod and crawler surveys, defect coding and reporting.Category: Plumbing
Method StatementFREEPDFCold Water Booster Pump Installation Method StatementDownload a booster pump installation method statement: consent checks, isolating and draining, pump set and break tank, pipework and commissioning.Category: Plumbing
Method StatementFREEPDFCold Water Storage Tank Installation and Replacement Method StatementDownload a cold water storage tank method statement: access survey, draining down, removing the old tank, fitting the new tank, filling and disinfecting.Category: Plumbing
Method StatementFREEPDFCommercial Gas Boiler and Plant Room Installation Method StatementDownload a commercial gas boiler installation method statement: plant room survey, lifting boilers, flue and ventilation, gas pipework, purging, commissioning.Category: Plumbing
Method StatementFREEPDFCommercial Heating Pipework Installation Method StatementDownload a commercial heating pipework method statement: design and set-out, handling pipe, supports, screwed, press-fit and welded joints, testing, flushing.Category: Plumbing
Method StatementFREEPDFCopper Pipework Installation Method StatementDownload a copper pipework installation method statement: route planning, cutting and deburring, soldered and compression joints, testing and flushing.Category: Plumbing
Method StatementFREEPDFDomestic Gas Boiler Installation and Replacement Method StatementDownload a gas boiler installation method statement: gas, flue and ventilation survey, removing the old boiler, fitting, tightness testing, commissioning.Category: Plumbing
Method StatementFREEPDFDrain Unblocking by Rodding and Hand Tools Method StatementDownload a drain unblocking method statement: opening access points, locating the blockage, rodding and hand augers, flushing the line, hygiene and clean-up.Category: Plumbing
Method StatementFREEPDFDraining Down Water and Heating Systems Method StatementDownload a draining down method statement for water and heating systems: isolation points, locking off, draining, labelling, refilling and venting.Category: Plumbing
Method StatementFREEPDFExpansion Vessel Recharging and Replacement Method StatementDownload an expansion vessel method statement: isolating and depressurising, checking and recharging, replacing the vessel, refilling, testing safety valves.Category: Plumbing
Method StatementFREEPDFFrozen Boiler Condensate Pipe Thawing and Re-routing Method StatementDownload a condensate pipe thawing method statement: confirming the fault, thawing the pipe, checking the trap, insulating or re-routing, restarting the boiler.Category: Plumbing
Method StatementFREEPDFGas Boiler Servicing and Repair Method StatementDownload a gas boiler servicing method statement: safety checks, tightness testing, strip-down and cleaning, combustion analysis and unsafe situations.Category: Plumbing
Method StatementFREEPDFGas Cooker and Hob Installation Method StatementDownload a gas cooker installation method statement for cookers and hobs: survey, isolation, stability bracket, gas connection, tightness test, commissioning.Category: Plumbing
Method StatementFREEPDFGas Fire and Flue Installation Method StatementDownload a gas fire installation method statement: chimney inspection and sweeping, flue liner and terminal, fitting the fire, spillage tests and CO alarm.Category: Plumbing
Method StatementFREEPDFGas Pipework Installation and Tightness Testing Method StatementDownload a gas pipework installation method statement: route planning, isolating the supply, installing pipework, tightness testing, purging and bonding.Category: Plumbing
Method StatementFREEPDFGround Source Heat Pump Installation Method StatementDownload a ground source heat pump installation method statement: set-out, ground loops, manifolds, pressure testing, heat pump and cylinder, commissioning.Category: Plumbing
Method StatementFREEPDFHeat Pump Servicing and Maintenance Method StatementDownload a heat pump servicing method statement: isolation, outdoor unit checks, system and cylinder checks, refrigerant leak checks, controls testing.Category: Plumbing
Method StatementFREEPDFHigh Pressure Water Jetting of Drains Method StatementDownload a drain jetting method statement: drain survey, jetter set-up and exclusion zone, hoses and nozzles, jetting from the surface, debris and CCTV.Category: Plumbing
Method StatementFREEPDFImmersion Heater Replacement Method StatementDownload an immersion heater replacement method statement: safe isolation, draining down, removing the element, fitting the new element, refill and testing.Category: Plumbing
Method StatementFREEPDFLandlord Gas Safety Inspection Method StatementDownload a landlord gas safety inspection method statement: access, tightness test, appliance and flue checks, safety devices, records and unsafe situations.Category: Plumbing
Method StatementFREEPDFLead Water Pipe Replacement Method StatementDownload a lead water pipe replacement method statement: confirming lead, isolating the supply, trench excavation, handling lead, new pipework and testing.Category: Plumbing
Method StatementFREEPDFLeak Detection and Repair Method StatementDownload a leak detection and repair method statement: isolating and testing, acoustic and thermal tracing, opening up, repairing the leak and retesting.Category: Plumbing
Method StatementFREEPDFLeaking Waste Trap and Pipe Joint Repair Method StatementDownload a waste trap and pipe joint repair method statement: finding the leak, isolating and protecting, remaking the joint, testing, drying, reporting damage.Category: Plumbing
Method StatementFREEPDFLow Water Pressure and Poor Flow Investigation Method StatementDownload a low water pressure investigation method statement: occupier history, valve checks, pressure and flow tests, blockage and leak checks, reporting.Category: Plumbing
Method StatementFREEPDFLPG Boiler Servicing and Repair Method StatementDownload an LPG boiler servicing method statement: initial checks, isolation and cleaning, replacing parts, tightness testing and combustion analysis.Category: Plumbing
Method StatementFREEPDFLPG Supply Installation Method StatementDownload an LPG supply installation method statement: siting and separation, base and pipe route, tank placement, regulators and valves, testing and purging.Category: Plumbing
Method StatementFREEPDFMacerator and Pumped Waste System Installation Method StatementDownload a macerator installation method statement: checking the unit and location, isolating supplies, fixing the unit, appliance and discharge connections.Category: Plumbing
Method StatementFREEPDFMagnetic System Filter Installation and Cleaning Method StatementDownload a magnetic system filter method statement: survey and isolation, draining down, fitting the filter, refilling and dosing, cleaning and sludge disposal.Category: Plumbing
Method StatementFREEPDFMotorised Zone Valve and Circulating Pump Replacement Method StatementDownload a zone valve and pump replacement method statement: fault-finding, safe isolation, draining, replacing the part, refilling, venting, testing.Category: Plumbing
Method StatementFREEPDFOil Storage Tank Installation and Replacement Method StatementDownload an oil tank installation method statement: siting the tank, removing the old tank, preparing the base, placing the bunded tank, supply line and valves.Category: Plumbing
Method StatementFREEPDFOil-Fired Boiler Installation Method StatementDownload an oil boiler installation method statement: siting and flue survey, removing the old boiler, flue, oil supply line and fire valve, commissioning.Category: Plumbing
Method StatementFREEPDFOil-Fired Boiler Servicing Method StatementDownload an oil boiler servicing method statement: isolating the boiler, strip-down and cleaning, nozzle and filters, fire valve and oil line, combustion tests.Category: Plumbing
Method StatementFREEPDFOutside Tap Installation Method StatementDownload an outside tap installation method statement: isolating, checking for services, drilling the wall, double check valve, fitting, lagging and testing.Category: Plumbing
Method StatementFREEPDFPipe Insulation and Lagging Method StatementDownload a pipe insulation and lagging method statement: asbestos checks on old lagging, access, measuring and cutting, fitting, sealing and labelling.Category: Plumbing
Method StatementFREEPDFPlastic and Push-Fit Pipework Installation Method StatementDownload a push-fit pipework installation method statement: route planning, cutting and inserts, push-fit joints, clipping, pressure testing and flushing.Category: Plumbing
Method StatementFREEPDFPower Flushing Central Heating Systems Method StatementDownload a power flushing method statement for central heating: survey, connecting the unit, chemical cleaning, flushing radiators, neutralising, inhibitor.Category: Plumbing
Method StatementFREEPDFPress-Fit Pipe Jointing Method StatementDownload a press-fit pipe jointing method statement: measuring and cutting, deburring, pressing joints with the right jaws, joint checks, pressure testing.Category: Plumbing
Method StatementFREEPDFPressure Testing of Water and Heating Pipework Method StatementDownload a pressure testing method statement for water and heating pipework: test plan, isolating and blanking off, filling, holding pressure, recording.Category: Plumbing
Method StatementFREEPDFRadiator Bleeding and System Pressure Top-Up Method StatementDownload a radiator bleeding method statement: heating off, venting each radiator, pressure gauge check, filling loop top-up, leak checks and re-venting.Category: Plumbing
Method StatementFREEPDFRadiator Installation and Replacement Method StatementDownload a radiator installation method statement: draining down, removing the old radiator, fixing brackets, hanging and connecting, venting and balancing.Category: Plumbing
Method StatementFREEPDFRadiator Valve and Leaking Radiator Repair Method StatementDownload a radiator valve repair method statement: finding the leak, isolating the system, repacking the gland, remaking joints, refilling and testing.Category: Plumbing
Method StatementFREEPDFRoom Thermostat and Programmer Replacement Method StatementDownload a room thermostat replacement method statement: checking controls, safe isolation, removing old controls, fitting and wiring new ones, testing.Category: Plumbing
Method StatementFREEPDFSeptic Tank and Sewage Treatment Plant Installation Method StatementDownload a septic tank installation method statement: consents and survey, excavation and support, lowering and anchoring the tank, backfill, commissioning.Category: Plumbing
Method StatementFREEPDFShower and Wet Room Installation Method StatementDownload a shower and wet room installation method statement: survey and isolation, first fix, tray and tanking, valve, pump and waste, testing.Category: Plumbing
Method StatementFREEPDFShower Valve Cartridge and Mixer Shower Repair Method StatementDownload a shower repair method statement: isolating and draining the valve, removing the cartridge, replacing parts, reassembly, testing temperature.Category: Plumbing
Method StatementFREEPDFSink, Basin, Tap and Sanitaryware Installation Method StatementDownload a sanitaryware installation method statement for sinks, basins, baths and taps: removing old fittings, fixing, wastes and traps, appliances, testing.Category: Plumbing
Method StatementFREEPDFSmart Thermostat and Heating Controls Installation Method StatementDownload a smart thermostat installation method statement: compatibility checks, safe isolation, fitting the receiver and hub, pairing, app set-up and testing.Category: Plumbing
Method StatementFREEPDFSolar Thermal Hot Water System Installation Method StatementDownload a solar thermal installation method statement: roof survey, brackets and collectors, pipework through the roof, pump station, cylinder, commissioning.Category: Plumbing
Method StatementFREEPDFSolar Thermal System Servicing and Maintenance Method StatementDownload a solar thermal servicing method statement: controller and pump checks, pressure and expansion vessel, fluid replacement, collector inspection.Category: Plumbing
Method StatementFREEPDFStopcock and Valve Replacement Method StatementDownload a stopcock and valve replacement method statement: identifying the valve, isolating and draining, replacing the valve, refilling, testing, labelling.Category: Plumbing
Method StatementFREEPDFTap Repair and Washer or Cartridge Replacement Method StatementDownload a tap repair method statement: identifying the tap, isolating the supply, dismantling, replacing washers or cartridges, descaling, leak checks.Category: Plumbing
Method StatementFREEPDFThermostatic Mixing Valve Installation and Servicing Method StatementDownload a thermostatic mixing valve method statement: outlet survey, isolating supplies, fitting the valve, setting temperature, fail-safe tests, servicing.Category: Plumbing
Method StatementFREEPDFThermostatic Radiator Valve Fitting and Replacement Method StatementDownload a thermostatic radiator valve method statement: valve checks, isolating and draining the radiator, removing the old valve, fitting, venting.Category: Plumbing
Method StatementFREEPDFUnvented Hot Water Cylinder Installation Method StatementDownload an unvented cylinder installation method statement: supply survey, removing the old cylinder, connections, safety devices and commissioning.Category: Plumbing
Method StatementFREEPDFVented Hot Water Cylinder Replacement Method StatementDownload a vented cylinder replacement method statement: draining down, asbestos lagging checks, removing the old cylinder, fitting, filling and testing.Category: Plumbing
Method StatementFREEPDFWashing Machine and Dishwasher Plumbing-In Method StatementDownload a washing machine plumbing-in method statement: isolating the water, valve and backflow protection, waste connection, positioning and test cycle.Category: Plumbing
Method StatementFREEPDFWater Hammer, Noisy Pipes and Airlock Clearing Method StatementDownload a water hammer method statement: finding the noise, checking fixings and pressure, clearing airlocks, fitting clips or arrestors, testing the system.Category: Plumbing
Method StatementFREEPDFWater Meter Installation Method StatementDownload a water meter installation method statement: agreeing the position with the water undertaker, isolating, fitting the meter and valves, testing.Category: Plumbing
Method StatementFREEPDFWater Service Pipe Connection and Repair Method StatementDownload a water service pipe repair method statement: notifying the water undertaker, locating services, trench support, pipe repair, testing, disinfecting.Category: Plumbing
Method StatementFREEPDFWater Softener Installation Method StatementDownload a water softener installation method statement: survey, isolating and positioning, bypass and check valve, drinking water tap, drain, commissioning.Category: Plumbing
Method StatementFREEPDFWater System Cleaning and Disinfection Method StatementDownload a water system disinfection method statement: written scheme review, isolation, tank cleaning, disinfecting, flushing, neutralising and sampling.Category: Plumbing
Method StatementFREEPDFWC Cistern Fill Valve and Flush Valve Repair Method StatementDownload a WC cistern valve repair method statement: isolating and draining, removing old parts, fitting new valves, setting the water level, testing the flush.Category: Plumbing
Method StatementFREEPDFWC Installation and Replacement Method StatementDownload a WC installation method statement: isolating, removing the old WC, fitting the pan and cistern, flush and fill valves, soil connection and testing.Category: Plumbing
Method StatementFREEPDFWC Leak Repair and Toilet Pan Refixing Method StatementDownload a WC leak repair method statement: finding the leak, isolating and draining, replacing seals and connectors, refixing the pan, testing the flush.Category: Plumbing
Method StatementFREEPDFWet Central Heating System Installation Method StatementDownload a central heating installation method statement: survey, first fix pipework, radiators and valves, pressure testing, commissioning and balancing.Category: Plumbing
Method StatementFREEPDFWet Underfloor Heating Installation Method StatementDownload an underfloor heating installation method statement: insulation and edge strip, laying pipe to the design, manifold, pressure testing, commissioning.Category: Plumbing

How to choose the right method statement template

  1. Find the right work type

    Search or browse the catalogue for the specific task — electrical, asbestos, hot works, working at height, scaffolding, roofing, concrete, and more.

  2. Open the template

    Click "Create" to open the method statement in our free interactive editor.

  3. Customise the work sequence and controls

    Adjust the sequence of work, equipment list, PPE, hazard register, and named responsible persons for your specific site and task.

  4. Download as a PDF (or pair with a risk assessment for full RAMS)

    Download as a professional method statement PDF, or pair with a matching risk assessment template to produce a complete RAMS document.

Frequently asked questions

Are these method statement templates really free to download?

Yes — completely free. Over 75 free UK method statement templates, free to use forever, no paywall. Customise to your task and download as a professional HSE-compliant PDF.

What is a method statement?

A method statement is a detailed document describing how a specific task will be carried out safely. It identifies the hazards, control measures, sequence of work, equipment used, PPE required, and the named persons responsible.

What is a RAMS document?

RAMS stands for Risk Assessment and Method Statement — a combined document that pairs the hazard-and-controls analysis (risk assessment) with the task-by-task work plan (method statement). UK construction commonly requires RAMS for high-risk activities.

What's the difference between a method statement and a RAMS document?

A method statement covers the "how" — the safe work plan. A RAMS document is broader: it combines the method statement with a risk assessment for the same task. Many UK clients ask for RAMS specifically for high-risk work.

Do you have a method statement template for electrical works?

Yes. We have multiple electrical method statement templates — general electrical installation, first-fix and second-fix electrical, socket and switch installation, consumer unit / fuse board installation, electrical testing and inspection, EV charger installation, temporary site electrics, and more.

Can I download method statement templates in PDF or Word format?

Every method statement template downloads as a professional PDF. Standard and Pro plans also unlock Word (.docx) export for further editing in Microsoft Word.

Do you have method statement templates for asbestos removal?

Yes. Our asbestos removal and management method statement template aligns with the Control of Asbestos Regulations 2012 (CAR 2012) and HSE guidance for licensed and non-licensed asbestos work.

Are these method statement templates HSE-compliant?

Yes. Every template aligns with HSE guidance, the Construction (Design and Management) Regulations 2015 (CDM 2015), and other relevant UK regulations (Work at Height 2005, COSHH 2002, CAR 2012 for asbestos, etc.) depending on the task.

How do I customise a method statement template to my specific task?

Open the template in our interactive generator and edit the sequence of work, equipment list, PPE requirements, hazard register, and named responsible persons to match your specific site and task.

Do you have method statement templates for hot works?

Yes. Our hot works / welding / cutting / grinding method statement template covers the controls required to manage fire risk, exposure to fumes, and contact hazards during hot work activities.

Can I download these method statements as RAMS?

Yes. Use the method statement template alongside a matching risk assessment template to build a complete RAMS document for your client. Our generators support combining them into one downloadable PDF.