Free Method Statement Templates

Explore our extensive collection of templates to create tailored method statements.

Free Method Statement Templates for Safe and Compliant Workplaces

Ensure workplace safety, legal compliance, and risk management with our FREE Method Statement Templates. Unlike basic templates with empty fields, our documents are professionally drafted, fully structured, and ready for customisation and editing. Designed for construction, manufacturing, and high-risk industries, each template provides clear, HSE-compliant guidance on work procedures, hazard identification, and control measures. With integrated Risk Assessment and Method Statements (RAMS), our templates help businesses streamline safety documentation and meet regulatory requirements. Download and customise your method statement templates today!

Complete your RAMS – You can create a FREE Risk Assessment using our risk templates HERE

TypeDocument TitleAction
Method StatementFREEPDFTimber Decking Installation Method StatementDownload a decking installation method statement template for landscapers and carpenters, covering posts, joists, boards and steps. Fully editable.Category: Construction
Method StatementFREEPDFTimber Fence Installation Method StatementTimber fence installation method statement template for fencing contractors, covering buried services, post holes and fixing panels. Fully editable.Category: Construction
Method StatementFREEPDFTimber Floor Joist Installation Method StatementDownload a floor joist installation method statement: design and bearing checks, wall plates and hangers, fixing joists, trimming openings, laying decking.Category: Construction
Method StatementFREEPDFTimber Floor Sanding and Refinishing Method StatementDownload a timber floor sanding method statement: room survey and preparation, nail punching and repairs, drum and edge sanding, cleaning down, applying finish.Category: Construction
Method StatementFREEPDFTimber Frame Erection Method StatementDownload a timber frame erection method statement: base checks, receiving panels, crane lifts, wall panels, floor cassettes, roof panels and fire safety.Category: Construction
Method StatementFREEPDFTimber Preservative Treatment for Woodworm and Rot Method StatementDownload a timber treatment method statement: surveying the timbers, protecting the area, cleaning down, applying the treatment and controlling re-entry.Category: Construction
Method StatementFREEPDFTimber Staircase Installation Method StatementDownload a timber staircase installation method statement: checking the opening, protecting edges, positioning the flight, fixing strings, fitting handrails.Category: Construction
Method StatementFREEPDFTipper Lorry Tipping Operations Method StatementDownload a tipper lorry tipping method statement: ground and overhead line checks, positioning the vehicle, tipping the load, freeing stuck loads, sheeting.Category: Fleet & Logistics
Method StatementFREEPDFTopsoil Import, Spreading and Grading Method StatementDownload a topsoil spreading method statement: planning deliveries, locating services, receiving and tipping soil, spreading and grading to levels.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTowbar Fitting and Wiring Method StatementDownload a towbar fitting and wiring method statement: preparing and raising the vehicle, removing the bumper, fitting the towbar, wiring and coding, testing.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFTower Crane Erection and Dismantling Method StatementDownload a tower crane erection and dismantling method statement: base and ties, mobile crane set-up, mast and jib, climbing, thorough examination.Category: Construction
Method StatementFREEPDFTrade-Plate Vehicle Delivery and Collection Method StatementDownload a trade plate method statement: vehicle roadworthiness checks, trade plates and documents, route planning, driving, handover, return travel.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFTraditional Cut Roof Construction Method StatementDownload a cut roof construction method statement: design and wall plate checks, setting out, ridge, rafters and purlins, hips and valleys, bracing.Category: Construction
Method StatementFREEPDFTraffic Management Maintenance Patrols on Motorways (NHSS 12AB) Method StatementDownload a traffic management maintenance method statement: vehicle checks, entering the closure, patrols, replacing equipment, cleaning and leaving site.Category: Highways & Traffic Management
Method StatementFREEPDFTraffic Sign and Post Installation on the Highway Method StatementDownload a traffic sign installation method statement: traffic management, services check, removing old signs, digging or driving posts, fixing sign faces.Category: Highways & Traffic Management
Method StatementFREEPDFTraffic Signal Installation and Maintenance Method StatementDownload a traffic signal installation method statement: traffic management, ducts and chambers, cabinet and cables, isolation, signal heads, commissioning.Category: Electrical
Method StatementFREEPDFTree Climbing and Aerial Rescue Method StatementDownload a tree climbing and aerial rescue method statement: tree and equipment inspection, anchor points, ascent, canopy work, descent and equipment checks.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTree Felling with Chainsaws Method StatementDownload a chainsaw tree felling method statement: permissions and wildlife checks, tree assessment, exclusion zone, felling cuts, snedding and crosscutting.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTree Inspection and Survey Method StatementDownload a tree inspection and survey method statement: agreeing the scope, walking the site, inspecting each tree, recording defects and risk, reporting.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTree Work from a MEWP Method StatementDownload a tree work from a MEWP method statement: survey and ground checks, MEWP set-up and pre-use checks, working from the basket, cutting and lowering.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTree, Shrub and Hedge Planting Method StatementDownload a tree planting method statement: service checks, marking out, digging pits, planting and staking, backfilling, guards and mulching.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTrenchless Drain Repair and Pipe Relining Method StatementDownload a trenchless drain repair and relining method statement: CCTV survey, jetting, flow control, liners and patches, curing, reopening connections.Category: Construction
Method StatementFREEPDFTrial Pit Excavation Method StatementTrial pit excavation method statement template for groundworks teams: services checks, hand digging, ground recording and backfill. Fully editable.Category: Construction
Method StatementFREEPDFTruck-Mounted Forklift (Moffett) Deliveries Method StatementDownload a Moffett delivery method statement: checking the drop point, dismounting, travelling on site, unloading pallets, placing loads, remounting.Category: Fleet & Logistics
Method StatementFREEPDFTunnelling and Microtunnelling Method StatementEnsure safe, compliant tunnelling and microtunnelling with our Method Statement Template. Fully editable and HSE-aligned—create yours online in minutes.Category: Construction
Method StatementFREEPDFTurbocharger Replacement Method StatementDownload a turbocharger replacement method statement: engine cooling, raising the vehicle, disconnecting lines, fitting the turbo, priming and test run.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFTurf Fertiliser and Feed Application Method StatementDownload a turf fertiliser application method statement: label and weather checks, spreader calibration, planned application, cleaning, storage.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTurf Laying Method StatementDownload a turf laying method statement: services check, lifting old turf, preparing and levelling the ground, laying turf rolls, firming and watering.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFTV Aerial and Satellite Dish Installation Method StatementDownload a TV aerial and satellite dish installation method statement: survey, safe access, brackets, cabling, alignment and signal testing on site.Category: Electrical
Method StatementFREEPDFTwo-Person Home Deliveries to Flats and Room of Choice Method StatementDownload a home delivery method statement: planning the load, parking and access checks, carrying items, placing in the room, removing packaging.Category: Fleet & Logistics
Method StatementFREEPDFTwo-Way Stop and Go on Single Carriageway Roads (NHSS 12D) Method StatementDownload a two-way stop and go method statement: site check and traffic count, advance signing, shuttle lane set-up, board operation, maintenance, removal.Category: Highways & Traffic Management
Method StatementFREEPDFTwo-Way Temporary Traffic Signals (NHSS 12D) Method StatementDownload a two-way traffic signals method statement: suitability checks, advance signing, setting up the signals, maintenance and failure, removal.Category: Highways & Traffic Management
Method StatementFREEPDFTyre Removal, Fitting and Balancing in the Workshop Method StatementDownload a tyre fitting and balancing method statement: raising the vehicle, wheel removal, tyre change, inflation, balancing, refitting and torque check.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFUnderbody Rust Proofing, Underseal and Cavity Wax Method StatementDownload an underseal method statement: raising the vehicle, cleaning and masking, spraying underseal, cavity wax injection, curing and lowering.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFUnderground Power Cable Laying Method StatementDownload an underground cable laying method statement: services scan, trial holes, trench support, cable drums, laying, backfill, termination and tests.Category: Electrical
Method StatementFREEPDFUnderground Utility Detection and Avoidance Method StatementEnsure safe, HSG47-compliant underground utility detection and excavation with our Method Statement Template. Fully editable—create yours online in minutes.Category: Construction
Method StatementFREEPDFUnderlift and Suspended-Tow Recovery Method StatementDownload a suspended-tow recovery method statement: positioning, attaching the underlift, lifting, securing, lighting board, towing and detaching.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFUnderpinning of Existing Foundations Method StatementDownload an underpinning method statement: engineer's pin sequence, party wall checks, excavation support, base inspection, concrete pins and dry packing.Category: Construction
Method StatementFREEPDFUnloading Heavy or Fragile Mixed Pallets Method StatementDownload a pallet unloading method statement: check the load, separate damaged pallets, unload with the lift truck, clear debris, record damage.Category: Fleet & Logistics
Method StatementFREEPDFUnvented Hot Water Cylinder Installation Method StatementDownload an unvented cylinder installation method statement: supply survey, removing the old cylinder, connections, safety devices and commissioning.Category: Plumbing
Method StatementFREEPDFUrban Multi-Drop Van Deliveries Method StatementDownload a van delivery method statement: vehicle check, loading in drop order, driving the route, parking and unloading at each drop, managing time and breaks.Category: Fleet & Logistics
Method StatementFREEPDFVacuum Packing and Modified Atmosphere Packaging Method StatementDownload a vacuum packing method statement: machine and gas supply checks, setting gas mix and seal, loading and sealing, pack and label checks, cleaning.Category: Food Industry
Method StatementFREEPDFVan Parcel Courier Collections and Deliveries Method StatementDownload a parcel courier method statement: loading the van, driving the route, making deliveries, handling difficult encounters, returning to the depot.Category: Fleet & Logistics
Method StatementFREEPDFVegetable Washing, Peeling and Preparation Method StatementDownload a vegetable preparation method statement: receiving and checking produce, washing, peeling, removing soil and peelings, cleaning and sanitising.Category: Food Industry
Method StatementFREEPDFVegetation, Scrub and Overgrowth Clearance Method StatementDownload a vegetation clearance method statement: surveying for hazards and wildlife, setting out, cutting back scrub, stacking and removing cuttings.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFVehicle Air-Conditioning Servicing and Refrigerant Recovery Method StatementDownload a vehicle air conditioning servicing method statement: refrigerant recovery, leak testing and repair, evacuating, recharging and performance checks.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Battery Replacement and Jump Starting in the Workshop Method StatementDownload a vehicle battery replacement method statement: checks, disconnecting and removing, fitting and reconnecting, jump starting and disposal.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Body Panel Repair and Panel Beating Method StatementDownload a body panel repair method statement: assessing the damage, removing trim, pulling and beating panels, applying filler, finishing ready for paint.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Breakdown on the Road – Driver Actions Until Recovery Method StatementDownload a vehicle breakdown method statement: move to safety, warn and clear the area, call for help, secure the load, hand over to recovery.Category: Fleet & Logistics
Method StatementFREEPDFVehicle Defect Reporting and Taking Vehicles Off the Road Method StatementDownload a vehicle defect method statement: walkaround checks, defect recording, roadworthiness decisions, stopping and making safe, off-the-road tagging.Category: Fleet & Logistics
Method StatementFREEPDFVehicle Dismantling, Airbag Removal and Parts Reclamation Method StatementDownload a vehicle dismantling method statement: vehicle preparation, airbag removal, depollution, fuel tank and battery removal, parts removal, parts storage.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Incursion Warning (Safe Lane) System Installation (NHSS 12AB) Method StatementDownload a vehicle incursion warning system method statement: closure checks, installing alarm units, testing and briefing, operation and removal.Category: Highways & Traffic Management
Method StatementFREEPDFVehicle Preparation, Sanding and Masking Method StatementDownload a vehicle preparation method statement: cleaning, sanding with dust extraction, filling and priming, masking and the final clean before paint.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Recovery onto a Flatbed or Tilt-Tray Method StatementDownload a flatbed recovery method statement: positioning, tilting the bed, winching on, securing with straps, checking the load, transporting and unloading.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Restraint System (Safety Barrier) Installation Method StatementDownload a safety barrier installation method statement: traffic management, services check and setting out, driving or setting posts, fixing beams, tensioning.Category: Highways & Traffic Management
Method StatementFREEPDFVehicle Steam Cleaning and Degreasing Method StatementDownload a vehicle steam cleaning method statement: checking the steam cleaner, protecting electrics, degreasing, rinsing, runoff to the interceptor.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Tracker, Dashcam and Alarm Installation Method StatementDownload a vehicle tracker installation method statement: preparing the vehicle, isolating the battery, removing trim, routing wiring, fitting and testing.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Valeting and Interior Cleaning Method StatementDownload a vehicle valeting method statement: pre-checks, exterior wash, interior vacuuming, chemical cleaning, drying and final inspection.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Welding and Cutting Method StatementDownload a vehicle welding and cutting method statement: clearing fuel and flammables, isolating electrics, fume extraction, welding or cutting, fire watch.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVehicle Wrapping, Vinyl and Window Tinting Method StatementDownload a vehicle wrapping method statement: preparing the bay, removing trim, cleaning panels, applying film and tint, trimming and post-heating.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFVending Machine Filling and Cleaning Method StatementDownload a vending machine filling and cleaning method statement: inspection, isolation, restocking, date checks, cleaning, cash and records.Category: Food Industry
Method StatementFREEPDFVented Hot Water Cylinder Replacement Method StatementDownload a vented cylinder replacement method statement: draining down, asbestos lagging checks, removing the old cylinder, fitting, filling and testing.Category: Plumbing
Method StatementFREEPDFVerge, Bank and Flail Mowing Method StatementDownload a flail mowing method statement: route checks, roadside signing and lighting, mowing with guards in place, clearing blockages, recovering signs.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFVery Narrow Aisle Truck Operations Method StatementDownload a VNA truck method statement: pre-use checks, aisle set-up, pedestrian control, operating within limits, stranded operator recovery and parking.Category: Fleet & Logistics
Method StatementFREEPDFVinyl, Laminate and Timber Floor Covering Installation Method StatementDownload a vinyl, laminate and timber floor covering method statement template for fitters, covering subfloor preparation, underlay and trims. Fully editable.Category: Construction
Method StatementFREEPDFVoid Property Clearance and Make-Ready Method StatementDownload a void property clearance method statement: entry hazard checks, clearing belongings, hazardous waste, cleaning, repairs and safety checks, securing.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFWalk-In Fridge and Freezer Defrosting and Cleaning Method StatementDownload a fridge defrosting method statement: move stock, switch off, defrost, mop melt water, clean and sanitise, and restock at temperature.Category: Food Industry
Method StatementFREEPDFWall and Floor Tiling Method StatementWall and floor tiling method statement template for tilers covering surface preparation, dust-controlled cutting, fixing and grouting. Fully editable.Category: Construction
Method StatementFREEPDFWashing Machine and Dishwasher Plumbing-In Method StatementDownload a washing machine plumbing-in method statement: isolating the water, valve and backflow protection, waste connection, positioning and test cycle.Category: Plumbing
Method StatementFREEPDFWasp and Hornet Nest Treatment Method StatementDownload a wasp and hornet nest treatment method statement: identifying the insect, setting out and safe access, treating the nest, removal and records.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFWaste Oil, Coolant and Automotive Waste Handling Method StatementDownload a waste oil handling method statement: segregating wastes, draining fluids, labelled bunded storage, spill response, carrier collection.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFWater Hammer, Noisy Pipes and Airlock Clearing Method StatementDownload a water hammer method statement: finding the noise, checking fixings and pressure, clearing airlocks, fitting clips or arrestors, testing the system.Category: Plumbing
Method StatementFREEPDFWater Meter Installation Method StatementDownload a water meter installation method statement: agreeing the position with the water undertaker, isolating, fitting the meter and valves, testing.Category: Plumbing
Method StatementFREEPDFWater Service Pipe Connection and Repair Method StatementDownload a water service pipe repair method statement: notifying the water undertaker, locating services, trench support, pipe repair, testing, disinfecting.Category: Plumbing
Method StatementFREEPDFWater Softener Installation Method StatementDownload a water softener installation method statement: survey, isolating and positioning, bypass and check valve, drinking water tap, drain, commissioning.Category: Plumbing
Method StatementFREEPDFWater System Cleaning and Disinfection Method StatementDownload a water system disinfection method statement: written scheme review, isolation, tank cleaning, disinfecting, flushing, neutralising and sampling.Category: Plumbing
Method StatementFREEPDFWC Cistern Fill Valve and Flush Valve Repair Method StatementDownload a WC cistern valve repair method statement: isolating and draining, removing old parts, fitting new valves, setting the water level, testing the flush.Category: Plumbing
Method StatementFREEPDFWC Installation and Replacement Method StatementDownload a WC installation method statement: isolating, removing the old WC, fitting the pan and cistern, flush and fill valves, soil connection and testing.Category: Plumbing
Method StatementFREEPDFWC Leak Repair and Toilet Pan Refixing Method StatementDownload a WC leak repair method statement: finding the leak, isolating and draining, replacing seals and connectors, refixing the pan, testing the flush.Category: Plumbing
Method StatementFREEPDFWet Central Heating System Installation Method StatementDownload a central heating installation method statement: survey, first fix pipework, radiators and valves, pressure testing, commissioning and balancing.Category: Plumbing
Method StatementFREEPDFWet Kitchen Floor Cleaning Method StatementDownload a wet kitchen floor cleaning method statement: preparation and warning signs, detergent dilution, mopping and squeegee, rinsing and drying.Category: Food Industry
Method StatementFREEPDFWet Underfloor Heating Installation Method StatementDownload an underfloor heating installation method statement: insulation and edge strip, laying pipe to the design, manifold, pressure testing, commissioning.Category: Plumbing
Method StatementFREEPDFWheel Alignment and Tracking Method StatementDownload a wheel alignment and tracking method statement: vehicle preparation, positioning on the lift, fitting sensors, adjusting settings, road test.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFWildflower Meadow Establishment Method StatementDownload a wildflower meadow establishment method statement: ground preparation, reducing fertility, sowing or turfing, rolling and watering, first-year cuts.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFWinching and Casualty Vehicle Recovery Method StatementDownload a vehicle winching method statement: casualty assessment, anchor points, exclusion zone, rigging the winch, winching, securing and removal.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFWindow and Door Mastic Sealing Method StatementDownload a mastic sealing method statement: frame and sealant checks, access set-up, cutting out old sealant, cleaning and priming, applying new sealant.Category: Landscaping and Grounds Maintenance
Method StatementFREEPDFWindscreen and Automotive Glass Replacement Method StatementDownload a windscreen replacement method statement: protecting the vehicle, removing trim, cutting out old glass, preparing the frame, fitting, cure time.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFWinter Gritting of Highways with Spreader Vehicles Method StatementDownload a winter gritting method statement: pre-use checks, loading salt, driving the treatment route, spreading salt, recording the treatment.Category: Highways & Traffic Management
Method StatementFREEPDFWok Cooking on Open-Flame Wok Ranges Method StatementDownload a wok cooking method statement: range checks, lighting the burners, heating the oil, cooking and tossing, cool down, shut down and clean down.Category: Food Industry
Method StatementFREEPDFWood-Fired and Gas Pizza Oven Operation Method StatementDownload a pizza oven method statement: pre-start checks, lighting the fire or burners, cooking and fire management, shut down, ash removal and cleaning.Category: Food Industry
Method StatementFREEPDFWorking at Height (Scaffolding and MEWPs) Method StatementEnsure safe, compliant working at height with our Method Statement Template for scaffolding and MEWPs. Reduce risks and create yours online in minutes.Category: Construction
Method StatementFREEPDFWorking in a Vehicle Inspection Pit Method StatementDownload a vehicle inspection pit method statement: preparing the pit, positioning the vehicle, access and lighting, working underneath, covering the pit.Category: Vehicle Services and the Motor Trade
Method StatementFREEPDFYard Shunting of Trailers with a Shunter Tractor Method StatementDownload a yard shunting method statement: shunter pre-use checks, yard plan, coupling the trailer, moving at yard speed, reversing onto the bay.Category: Fleet & Logistics

How to choose the right method statement template

  1. Find the right work type

    Search or browse the catalogue for the specific task — electrical, asbestos, hot works, working at height, scaffolding, roofing, concrete, and more.

  2. Open the template

    Click "Create" to open the method statement in our free interactive editor.

  3. Customise the work sequence and controls

    Adjust the sequence of work, equipment list, PPE, hazard register, and named responsible persons for your specific site and task.

  4. Download as a PDF (or pair with a risk assessment for full RAMS)

    Download as a professional method statement PDF, or pair with a matching risk assessment template to produce a complete RAMS document.

Frequently asked questions

Are these method statement templates really free to download?

Yes — completely free. Over 693 free UK method statement templates, free to use forever, no paywall. Customise to your task and download as a professional HSE-compliant PDF.

What is a method statement?

A method statement is a detailed document describing how a specific task will be carried out safely. It identifies the hazards, control measures, sequence of work, equipment used, PPE required, and the named persons responsible.

What is a RAMS document?

RAMS stands for Risk Assessment and Method Statement — a combined document that pairs the hazard-and-controls analysis (risk assessment) with the task-by-task work plan (method statement). UK construction commonly requires RAMS for high-risk activities.

What's the difference between a method statement and a RAMS document?

A method statement covers the "how" — the safe work plan. A RAMS document is broader: it combines the method statement with a risk assessment for the same task. Many UK clients ask for RAMS specifically for high-risk work.

Do you have a method statement template for electrical works?

Yes. We have multiple electrical method statement templates — general electrical installation, first-fix and second-fix electrical, socket and switch installation, consumer unit / fuse board installation, electrical testing and inspection, EV charger installation, temporary site electrics, and more.

Can I download method statement templates in PDF or Word format?

Every method statement template downloads as a professional PDF. Standard and Pro plans also unlock Word (.docx) export for further editing in Microsoft Word.

Do you have method statement templates for asbestos removal?

Yes. Our asbestos removal and management method statement template aligns with the Control of Asbestos Regulations 2012 (CAR 2012) and HSE guidance for licensed and non-licensed asbestos work.

Are these method statement templates HSE-compliant?

Yes. Every template aligns with HSE guidance, the Construction (Design and Management) Regulations 2015 (CDM 2015), and other relevant UK regulations (Work at Height 2005, COSHH 2002, CAR 2012 for asbestos, etc.) depending on the task.

How do I customise a method statement template to my specific task?

Open the template in our interactive generator and edit the sequence of work, equipment list, PPE requirements, hazard register, and named responsible persons to match your specific site and task.

Do you have method statement templates for hot works?

Yes. Our hot works / welding / cutting / grinding method statement template covers the controls required to manage fire risk, exposure to fumes, and contact hazards during hot work activities.

Can I download these method statements as RAMS?

Yes. Use the method statement template alongside a matching risk assessment template to build a complete RAMS document for your client. Our generators support combining them into one downloadable PDF.