Safety Checklist Form Template

Instantly Create Your Checklist, Just enter your details

Damp Proof Course Installation Safety Checklist

Use our Checklist creator tool to create customised workplace safety documents. Learn more about Damp Proof Course Installation Safety Checklist Template below
50% off your first month Standard £4.99 · Pro £12.49 for month one — applied automatically. Ends 31 July Claim offer
Safety Checklist Creator
Guest

Loading Safety Checklist Creator

Please wait while we prepare your workspace

Checklist Questions

Every question is included by default. Untick any you want to leave out, or delete the ones you don't need.

Click Add Question to add your own custom checks. Click a row to edit its wording, and drag to reorder.

The Yes / No / N/A tick-boxes and comments space are added automatically on the exported PDF or Word document.

No questions added yet — add your first one below.

Logo & Sign-off

Custom Branding Not Available

Create a free account, then upgrade to add your company logo.

Sign to confirm you completed this checklist

Click to sign on behalf, or leave blank for on-paper approval.

Review & Export

Choose your page orientation, then export a print-ready checklist.

Preview Document

See exactly how your checklist PDF will look before downloading.

Download PDF

Print-ready PDF with Yes / No / N/A tick-boxes and a comments space.

Export to Word

An editable Word (.doc) version with Yes / No / N/A tick-boxes and a comments space.

Export to Excel

A spreadsheet version for digital tracking and filtering.

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

PDF Preview

100%

Creating preview

Building your PDF preview…

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Risk Assessment Description:

This damp proof course installation safety checklist template from Health & Safety Zone helps bricklayers, plasterers, tilers and site supervisors ensure safe chemical DPC injection and related works.

It covers planning, competence, site conditions, chemical handling, dust control, hand tools, ventilation, personal protective equipment, waste management, spill response and emergency measures. It references the Control of Substances Hazardous to Health Regulations 2002 and the Construction (Design and Management) Regulations 2015.

Use this checklist for:

  • Pre‑start checks before any DPC injection work begins.
  • Site inspections during the installation process.
  • Post‑work sign‑off and make‑safe verification.

To use this checklist, the supervisor or designated operative ticks Yes, No or N/A for each question. Any No response triggers immediate corrective action before work can continue, and the outcome is recorded on the site safety register. The checklist can be printed or accessed digitally on a tablet, allowing quick verification on‑site.

Each item is answered Yes, No or N/A – any No answer must be resolved before proceeding.

Fully editable and shareable — customise the questions to your project, download as a PDF and share with your team.

Compliant with: Control of Substances Hazardous to Health Regulations 2002; Construction (Design and Management) Regulations 2015. HSE Guidance on DPC chemical handling is also referenced.

Sample PDF Document Image:

Checks covered in this Damp Proof Course Installation checklist

This Damp Proof Course Installation safety checklist template covers 18 checks. Customise the questions to your workplace, then download a professional, print-ready PDF with Yes / No / N/A tick-boxes and a comments space.

#Checklist item
1Has a COSHH assessment for the DPC chemical been completed and communicated to operatives?
2Are all operatives trained and competent in DPC injection techniques and chemical handling?
3Is a method statement or risk assessment for the specific DPC installation task available on site?
4Is the work area clearly marked and secured to prevent unauthorised access?
5Is the ground surface clean, stable and free of trip hazards where the injection equipment will be positioned?
6Is adequate ventilation provided for the work area, especially when using solvent‑based DPC products?
7Are dust extraction or suppression measures (e.g., wet drilling) in place when drilling into masonry?
8Are all hand tools (drills, mixers, trowels) inspected and in good condition before use?
9Is personal protective equipment (gloves, goggles, respirator where required, long‑sleeved clothing) available and being worn?
10Is a suitable respirator with appropriate filter provided for any airborne chemical or dust exposure?
11Are safety data sheets for the DPC chemicals accessible on site?
12Is the injection pump calibrated and tested for correct pressure before use?
13Are the injection hoses and fittings free from damage, leaks or blockages?
14Is the injection point clearly identified and marked according to the installation plan?
15Is the correct DPC product type and quantity verified against the specification?
16Is waste material (unused chemical, contaminated rags) collected in labelled containers for safe disposal?
17Are emergency spill kits and appropriate first‑aid equipment readily available?
18Has the area been inspected after work to ensure no residual chemical hazards remain and tools are stored safely?

Frequently asked questions

Are these safety checklist templates really free to download?

Yes — completely free. Customise any checklist to your workplace and download a professional, print-ready PDF in minutes. No paywall, and no signup required for guests.

What format do the safety checklists download in?

Checklists download as a professional PDF, ready to print and complete on-site — each question has clear Yes / No / N/A tick-boxes and a comments space. You choose portrait or landscape at download. Word and spreadsheet formats are being added.

Can I customise the checklist questions to my workplace?

Yes — fully. Add your own questions, edit or remove any of the pre-written ones, and reorder them to suit your site, task or inspection before you download.

Are the safety checklists suitable for UK workplaces?

Yes. The checklists are written around UK health and safety good practice and HSE guidance, and are suitable for inspections, audits, toolbox checks and routine workplace monitoring.

Do I need an account to use the checklist templates?

No — guests can build and download a checklist for free without signing up. Register a free account if you want to save checklists to your dashboard and edit them later.

Can I add my company logo and branding to the checklist?

Yes — add your company logo, colours and details on Standard and Pro plans, so the exported checklist carries your own branding. Guests and Free downloads carry Health & Safety Zone branding.

How do I complete the checklist once it is downloaded?

The exported checklist is a blank, ready-to-use document: print it and tick Yes, No or N/A against each question and write any comments in the notes space, then sign and date it in the sign-off section.

What types of safety checklist can I create?

We are building specialist checklists across a wide range of subjects and industries — fire safety, workplace inspections, equipment and machinery checks, site inductions, vehicle checks, PPE, first aid and more. Browse by category to find the right one.

How often should safety checklists be completed?

It depends on the activity and your risk assessment — many checks are daily, weekly or monthly, while others are done before each task or shift. Completed, dated checklists provide a useful record of your monitoring.

Are the checklists a substitute for a risk assessment?

No. A checklist is a monitoring and inspection tool that complements your risk assessments and method statements — it helps confirm that controls are in place and working. Use them alongside your risk assessments.