Stump Grinding Method Statement

Use our method statement creator tool to create customised workplace safety documents. Learn more about Stump Grinding Method Statement Template below
Company:
Issue:
Approved:
Ver:
Guest

Loading Document Creator

Please wait while we prepare your workspace

Edit and customise your document

Logo, Branding & Sign-off

Company brandingStandard+

Upgrade to add your company logo and brand colours, and customise how your documents look.Available on our Standard and Pro plans.

Add my branding →

Approved by

Sign to confirm you have approved this document

Review & Export

Your document is ready. Register free to download your PDF — it opens in a new tab and signs you in here automatically, so don't refresh or leave this page.

Export

Preview document
See exactly how it looks before downloading.
Download PDF .PDF
Register a free account to download — takes seconds, your document stays right here.
Download Word .DOCX Standard & Pro
An editable Word (.docx) version — upgrade to unlock.

Save & share

Save to account Not saved
Sign in to save and manage your documents.
Manage document
Sign in to manage, edit and re-export this document.
Save first, then manage, edit and re-export it here.
Manage, edit and re-export your saved document.
Create a RAMS pack
Sign in to bundle saved documents into a pack.
Save first, then merge saved documents into one pack.
Merge saved documents into one cover + contents pack.
Sign in Create
Share & collect sign-offs
Create a free account to share and collect sign-offs.
Save first, then send a secure link for your team to sign.
Send a secure link — your team reads & signs to confirm.

How sharing & packs work

Collecting sign-offs

All plans

Turn a saved document into proof of a briefed workforce — send a secure link and your team signs to confirm they've read and understood it.

  • Secure share links
  • Collect e-signatures
  • No account to sign
  • Compliance audit trail
  • QR signage posters
  • PDF proof report

Shared pages carry Health & Safety Zone branding — upgrade to Standard/Pro to use your own logo & colours.

RAMS packs (Site Packs)

All plans

Bundle multiple saved documents into a single deliverable pack — a cover page + table of contents + all member document PDFs merged into one professional export.

  • Cover page + table of contents
  • All member PDFs merged into one
  • Share via one secure link
  • Recipients sign once for the whole pack

Share the pack with a customer or workforce — recipients review each document and sign once to acknowledge receipt of the entire pack.

loading...

PLEASE WAIT DO NOT CLOSE THIS PAGE
YOUR DOCUMENT IS BEING GENERATED

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Method statement Description:

This stump grinding method statement template from Health & Safety Zone is designed for landscapers, grounds maintenance operatives, tree surgery ground crews and supervisors who need a clear, compliant safe system of work for removing tree stumps with pedestrian and tracked stump grinders.

It covers the main hazards of stump grinding, including flying chippings and debris thrown from the cutter head, contact with the rotating cutter, striking buried services, noise and vibration from the machine, wood dust and petrol fuelling, so each stage of the job can be planned before work starts.

Use this method statement for:

  • Garden and domestic stump removal after a tree has been felled by others.
  • Grounds maintenance and amenity sites such as parks, schools and housing estates.
  • Preparing ground for replanting, turfing or paving once the stump has been ground out.

The template sets out the introduction and legal framework, the training and competence required, a scope of works broken into stages, step-by-step planning for each stage, the personal protective equipment required and the finishing and post-operation checks, ready for your team to expand with site-specific detail.

It does not cover tree felling or work on the standing tree, which needs its own arborist method statement, and it works alongside your task-specific risk assessment, which carries the risks and control measures for the job.

Fully editable and shareable, it can be tailored to your site, branded with your company details and shared with your workforce for sign-off before work begins.

Compliant with: Health and Safety at Work etc. Act 1974, Management of Health and Safety at Work Regulations 1999, Provision and Use of Work Equipment Regulations 1998, Control of Noise at Work Regulations 2005, Control of Vibration at Work Regulations 2005, Control of Substances Hazardous to Health Regulations 2002, Manual Handling Operations Regulations 1992, Personal Protective Equipment at Work Regulations 1992, Electricity at Work Regulations 1989, Dangerous Substances and Explosive Atmospheres Regulations 2002, Health and Safety (Safety Signs and Signals) Regulations 1996, Health and Safety (First-Aid) Regulations 1981, Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013, Environmental Protection Act 1990, Waste (England and Wales) Regulations 2011.

Sample PDF Document Image: