Method Statement Template Creator

Instantly Create Your Method Statement, Just enter your details

Offside Lane Closure with a Full-Width Hard Shoulder, Upstream Method (NHSS 12AB) Method Statement

Use our method statement creator tool to create customised workplace safety documents. Learn more about Offside Lane Closure with a Full-Width Hard Shoulder, Upstream Method (NHSS 12AB) Method Statement Template below
Company:
Issue:
Approved:
Ver:
Guest

Loading Document Creator

Please wait while we prepare your workspace

Edit and customise your document

Logo, Branding & Sign-off

Company brandingStandard+

Upgrade to add your company logo and brand colours, and customise how your documents look.Available on our Standard and Pro plans.

Add my branding →

Approved by

Sign to confirm you have approved this document

Review & Export

Your document is ready. Register free to download your PDF — it opens in a new tab and signs you in here automatically, so don't refresh or leave this page.

Export

Preview document
See exactly how it looks before downloading.
Download PDF .PDF
Register a free account to download — takes seconds, your document stays right here.
Download Word .DOCX Standard & Pro
An editable Word (.docx) version — upgrade to unlock.

Save & share

Save to account Not saved
Sign in to save and manage your documents.
Manage document
Sign in to manage, edit and re-export this document.
Save first, then manage, edit and re-export it here.
Manage, edit and re-export your saved document.
Create a RAMS pack
Sign in to bundle saved documents into a pack.
Save first, then merge saved documents into one pack.
Merge saved documents into one cover + contents pack.
Sign in Create
Share & collect sign-offs
Create a free account to share and collect sign-offs.
Save first, then send a secure link for your team to sign.
Send a secure link — your team reads & signs to confirm.

How sharing & packs work

Collecting sign-offs

All plans

Turn a saved document into proof of a briefed workforce — send a secure link and your team signs to confirm they've read and understood it.

  • Secure share links
  • Collect e-signatures
  • No account to sign
  • Compliance audit trail
  • QR signage posters
  • PDF proof report

Shared pages carry Health & Safety Zone branding — upgrade to Standard/Pro to use your own logo & colours.

RAMS packs (Site Packs)

All plans

Bundle multiple saved documents into a single deliverable pack — a cover page + table of contents + all member document PDFs merged into one professional export.

  • Cover page + table of contents
  • All member PDFs merged into one
  • Share via one secure link
  • Recipients sign once for the whole pack

Share the pack with a customer or workforce — recipients review each document and sign once to acknowledge receipt of the entire pack.

loading...

PLEASE WAIT DO NOT CLOSE THIS PAGE
YOUR DOCUMENT IS BEING GENERATED

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Method statement Description:

This offside lane closure with hard shoulder method statement template from Health & Safety Zone is designed for traffic management operatives, foremen, TM supervisors and highway contractors who need a clear, compliant safe system of work for installing, maintaining and removing an offside lane closure by the upstream method on a carriageway with a full-width hard shoulder.

It covers the main hazards of working beside live high-speed traffic, including vehicles entering the closure, operatives working on foot on the live carriageway and hard shoulder, night and long shift working and manual handling of cones, signs and frames, with the closure set out in line with Chapter 8 of the Traffic Signs Manual.

Use this method statement for:

  • Motorway lane closures installed from the hard shoulder by an impact protection vehicle and a traffic management vehicle.
  • High-speed dual carriageway lane closures with a full-width hard shoulder for planned works.
  • Walked off closures that are removed and reinstalled for a later shift.

The template sets out the introduction and legal framework, the training and competence required, a scope of works broken into stages, step-by-step planning for each stage from arrival checks and advance signs to the taper, longitudinal coning, maintenance and removal, the personal protective equipment required and the finishing and post-operation checks, ready for your team to expand with site-specific detail.

Fully editable and shareable, it can be tailored to your site, branded with your company details and shared with your workforce for sign-off before work begins.

Compliant with: Health and Safety at Work etc. Act 1974, Management of Health and Safety at Work Regulations 1999, Highways Act 1980, Traffic Signs Regulations and General Directions 2016, Road Traffic Regulation Act 1984, Motorways Traffic (England and Wales) Regulations 1982, Road Vehicles Lighting Regulations 1989, Road Vehicles (Construction and Use) Regulations 1986, Road Traffic Act 1988, Construction (Design and Management) Regulations 2015, Provision and Use of Work Equipment Regulations 1998, Work at Height Regulations 2005, Manual Handling Operations Regulations 1992, Personal Protective Equipment at Work Regulations 1992, Working Time Regulations 1998, Health and Safety (First-Aid) Regulations 1981, Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013.

Sample PDF Document Image: