Method Statement Template Creator

Instantly Create Your Method Statement, Just enter your details

Abnormal Load Movement under the Special Types Order Method Statement

Use our method statement creator tool to create customised workplace safety documents. Learn more about Abnormal Load Movement under the Special Types Order Method Statement Template below
Company:
Issue:
Approved:
Ver:
Guest

Loading Document Creator

Please wait while we prepare your workspace

Edit and customise your document

Logo, Branding & Sign-off

Company brandingStandard+

Upgrade to add your company logo and brand colours, and customise how your documents look.Available on our Standard and Pro plans.

Add my branding →

Approved by

Sign to confirm you have approved this document

Review & Export

Your document is ready. Register free to download your PDF — it opens in a new tab and signs you in here automatically, so don't refresh or leave this page.

Export

Preview document
See exactly how it looks before downloading.
Download PDF .PDF
Register a free account to download — takes seconds, your document stays right here.
Download Word .DOCX Standard & Pro
An editable Word (.docx) version — upgrade to unlock.

Save & share

Save to account Not saved
Sign in to save and manage your documents.
Manage document
Sign in to manage, edit and re-export this document.
Save first, then manage, edit and re-export it here.
Manage, edit and re-export your saved document.
Create a RAMS pack
Sign in to bundle saved documents into a pack.
Save first, then merge saved documents into one pack.
Merge saved documents into one cover + contents pack.
Sign in Create
Share & collect sign-offs
Create a free account to share and collect sign-offs.
Save first, then send a secure link for your team to sign.
Send a secure link — your team reads & signs to confirm.

How sharing & packs work

Collecting sign-offs

All plans

Turn a saved document into proof of a briefed workforce — send a secure link and your team signs to confirm they've read and understood it.

  • Secure share links
  • Collect e-signatures
  • No account to sign
  • Compliance audit trail
  • QR signage posters
  • PDF proof report

Shared pages carry Health & Safety Zone branding — upgrade to Standard/Pro to use your own logo & colours.

RAMS packs (Site Packs)

All plans

Bundle multiple saved documents into a single deliverable pack — a cover page + table of contents + all member document PDFs merged into one professional export.

  • Cover page + table of contents
  • All member PDFs merged into one
  • Share via one secure link
  • Recipients sign once for the whole pack

Share the pack with a customer or workforce — recipients review each document and sign once to acknowledge receipt of the entire pack.

loading...

PLEASE WAIT DO NOT CLOSE THIS PAGE
YOUR DOCUMENT IS BEING GENERATED

Important: The documents produced by this tool are templates only. They must be reviewed and approved by a competent person or your HSEQ representative prior to publication or circulation, in accordance with our Terms & Conditions.

Still Using Paper Sign-Off Sheets?

Once you've generated and saved your document, create a secure share link to distribute across any platform. Collect encrypted digital signatures from your team and generate professional sign-off reports.

Generate
Save
Share
Sign
Report
Try It Free

Increased Limits Available

Method statement Description:

This abnormal load movement method statement template from Health & Safety Zone is designed for HGV and van drivers, transport managers and depot supervisors who need a clear, compliant safe system of work for moving abnormal indivisible loads under the Special Types Order.

It covers the main hazards of abnormal load movement, including striking overhead and roadside obstructions on an oversized route, the load shifting or falling during the journey, people being struck by the vehicle or its projections, manual handling and lifting injuries when loading and unloading, and working at height on the vehicle when lashing and checking the load.

Use this method statement for:

  • Abnormal indivisible load movements under the Special Types Order on public roads.
  • Oversized or overweight load movements requiring police and highway authority notices and escorts.
  • Depot and yard loading, securing and unloading of large loads by crane or loader.

The template sets out the introduction and legal framework, the training and competence required, a scope of works broken into stages, step-by-step planning for each stage, the personal protective equipment required and the finishing and post-operation checks, ready for your team to expand with site-specific detail.

Fully editable and shareable, it can be tailored to your site, branded with your company details and shared with your workforce for sign-off before work begins.

Compliant with: Health and Safety at Work etc. Act 1974, Management of Health and Safety at Work Regulations 1999, Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013, Health and Safety (First-Aid) Regulations 1981, Road Vehicles (Authorisation of Special Types) (General) Order 2003, Road Traffic Act 1988, Road Traffic Regulation Act 1984, Road Vehicles (Construction and Use) Regulations 1986, Road Vehicles (Authorised Weight) Regulations 1998, Road Vehicles Lighting Regulations 1989, Highways Act 1980, Goods Vehicles (Licensing of Operators) Act 1995, Vehicle Drivers (Certificates of Professional Competence) Regulations 2007, Regulation (EC) No 561/2006 (GB drivers’ hours rules), Regulation (EU) No 165/2014 (GB tachograph rules), Road Transport (Working Time) Regulations 2005, Provision and Use of Work Equipment Regulations 1998, Lifting Operations and Lifting Equipment Regulations 1998, Manual Handling Operations Regulations 1992, Work at Height Regulations 2005, Control of Noise at Work Regulations 2005, Control of Vibration at Work Regulations 2005, Personal Protective Equipment at Work Regulations 1992, Environmental Protection Act 1990, Motorways Traffic (England and Wales) Regulations 1982.

Sample PDF Document Image: