Free Method Statement Templates

Explore our extensive collection of templates to create tailored method statements.

Free Method Statement Templates for Safe and Compliant Workplaces

Ensure workplace safety, legal compliance, and risk management with our FREE Method Statement Templates. Unlike basic templates with empty fields, our documents are professionally drafted, fully structured, and ready for customisation and editing. Designed for construction, manufacturing, and high-risk industries, each template provides clear, HSE-compliant guidance on work procedures, hazard identification, and control measures. With integrated Risk Assessment and Method Statements (RAMS), our templates help businesses streamline safety documentation and meet regulatory requirements. Download and customise your method statement templates today!

Complete your RAMS – You can create a FREE Risk Assessment using our risk templates HERE

TypeDocument TitleAction
Method StatementFREEPDFAdditional Socket and Fused Spur Installation Method StatementDownload a socket and fused spur installation method statement: circuit checks, safe isolation, cable routing, connecting the outlet, testing and certifying.Category: Electrical
Method StatementFREEPDFBattery Energy Storage System Installation Method StatementDownload a battery storage installation method statement: survey, DNO notification, handling, mounting, AC and DC isolation, testing and commissioning.Category: Electrical
Method StatementFREEPDFCable Containment Installation Method StatementDownload a cable containment installation method statement: setting out, hidden services checks, conduit, trunking and tray fixing, earthing and bonding.Category: Electrical
Method StatementFREEPDFCable Pulling and Installation Method StatementDownload a cable pulling and installation method statement: cable schedule checks, drum set-up, pulling by hand or winch, dressing, labelling, testing.Category: Construction, Electrical
Method StatementFREEPDFCCTV System Installation Method StatementDownload a CCTV installation method statement: survey, cable routes, cameras fixed at height, recorder supply, safe isolation, testing and handover.Category: Electrical
Method StatementFREEPDFCeiling Fan Installation Method StatementDownload a ceiling fan installation method statement: fixing point checks, safe isolation, support bracket, fan and control connections, testing.Category: Electrical
Method StatementFREEPDFCircuit Breaker and RCBO Replacement Method StatementDownload an RCBO replacement method statement: fault finding, safe isolation, removing and fitting the device, dead testing, energising and live testing.Category: Electrical
Method StatementFREEPDFCommercial and Industrial Electrical Installation Method StatementDownload a commercial electrical installation method statement: safe isolation, containment, cable pulling, switchgear, termination and testing.Category: Electrical
Method StatementFREEPDFConsumer Unit & Fuse Board Installation Method StatementEnsure safe, compliant consumer unit and fuse board installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFConsumer Unit Replacement in Homes Method StatementDownload a consumer unit replacement method statement: survey and testing, safe isolation, removing the old unit, fitting the new one, testing, certification.Category: Electrical
Method StatementFREEPDFData and Network Cabling Installation Method StatementDownload a data cabling installation method statement: survey, containment, network cabinets, cable pulling, termination, link testing and handover.Category: Electrical
Method StatementFREEPDFDistribution Board Installation Method StatementDownload a distribution board installation method statement: outage planning, safe isolation, old board removal, connection, dead and live testing.Category: Electrical
Method StatementFREEPDFDomestic Electrical Rewiring Method StatementDownload a domestic rewire method statement: survey, safe isolation, first fix cabling, new consumer unit, second fix, testing and certification.Category: Electrical
Method StatementFREEPDFDoor Entry and Access Control Installation Method StatementDownload a door entry and access control method statement: survey, cabling, readers and locks, safe isolation, fire release and escape door testing.Category: Electrical
Method StatementFREEPDFEarthing & Bonding Installation Method StatementEnsure safe, compliant earthing and bonding installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFElectric Cooker and Hob Circuit Installation Method StatementDownload a cooker circuit installation method statement: supply and appliance checks, safe isolation, circuit and switch installation, connection, testing.Category: Electrical
Method StatementFREEPDFElectric Gate and Barrier Installation Method StatementDownload an electric gate and barrier installation method statement: foundations, motors, safety devices, isolation, commissioning and testing.Category: Electrical
Method StatementFREEPDFElectric Shower Installation Method StatementDownload an electric shower installation method statement: supply checks, safe isolation, new circuit and isolator, fitting, dead and live tests, notifying.Category: Electrical
Method StatementFREEPDFElectric Storage and Panel Heater Installation Method StatementDownload an electric heater installation method statement: survey and asbestos check, safe isolation, removing old heaters, fixing and connecting, testing.Category: Electrical
Method StatementFREEPDFElectric Underfloor Heating Installation Method StatementDownload an electric underfloor heating method statement: design checks, floor preparation, laying mats or cables, element tests, connection and certificate.Category: Electrical
Method StatementFREEPDFElectrical Disconnection Before Demolition Method StatementDownload an electrical disconnection before demolition method statement: supplies and generators, DNO disconnection, isolation, dead certificate.Category: Electrical
Method StatementFREEPDFElectrical Fault Finding Method StatementDownload an electrical fault finding method statement: fault information, safe isolation, dead tests, justified live tests, repair, retest and re-energising.Category: Electrical
Method StatementFREEPDFElectrical Installation Condition Report Inspection and Testing Method StatementDownload an EICR method statement: agreeing extent, visual inspection, safe isolation and dead tests, live tests, recording observations, issuing the report.Category: Electrical
Method StatementFREEPDFElectrical Installation in Hazardous Areas Method StatementDownload a hazardous area electrical installation method statement: zone checks, permits, gas testing, certified equipment, glands, inspection and tests.Category: Electrical
Method StatementFREEPDFElectrical Substation Work Method StatementDownload an electrical substation work method statement: safety documents, access, HV switching, isolation and earthing, permit to work and restoration.Category: Electrical
Method StatementFREEPDFElectrical Testing & Inspection Method StatementEnsure safe, compliant electrical testing and inspection with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFEmergency Lighting Installation and Testing Method StatementDownload an emergency lighting installation method statement: design checks, safe isolation, luminaires and signs, testing, duration test and log book.Category: Electrical
Method StatementFREEPDFEV Charger Installation Method StatementEnsure safe, compliant EV charger installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFExternal and Floodlighting Installation Method StatementDownload a floodlighting installation method statement: services checks, trenching, cable ducts, columns and floodlights at height, isolation and testing.Category: Electrical
Method StatementFREEPDFExtractor Fan Installation Method StatementDownload an extractor fan installation method statement: survey and asbestos checks, safe isolation, forming the opening, fitting and wiring the fan, testing.Category: Electrical
Method StatementFREEPDFFibre Optic Cabling Installation and Splicing Method StatementDownload a fibre optic cabling and splicing method statement: route survey, containment, blowing or pulling fibre, splicing, laser safety and testing.Category: Electrical
Method StatementFREEPDFFire Alarm System Installation Method StatementDownload a fire alarm installation method statement: design checks, cabling and fire stopping, panel and devices, mains connection, commissioning, log book.Category: Electrical
Method StatementFREEPDFFirst Fix Electrical Installation Method StatementEnsure safe, compliant first fix electrical installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFHeat Pump Electrical Connection Method StatementDownload a heat pump electrical connection method statement: supply checks, safe isolation, new circuit and isolator, controls wiring, testing, certificate.Category: Electrical
Method StatementFREEPDFHigh Mast Lighting Installation and Maintenance Method StatementDownload a high mast lighting method statement: mast inspection, safe isolation, lowering the carriage, winch and rope checks, lanterns, testing.Category: Electrical
Method StatementFREEPDFHigh Voltage Cable Laying and Jointing Method StatementDownload an HV cable laying and jointing method statement: safety documents, services and trenching, laying the cable, jointing, testing, reinstatement.Category: Electrical
Method StatementFREEPDFHigh Voltage Switching and Isolation Method StatementDownload a high voltage switching and isolation method statement: switching programme, isolation, proving dead, earthing, safety documents, restoration.Category: Electrical
Method StatementFREEPDFIntruder Alarm Installation Method StatementDownload an intruder alarm installation method statement: survey, safe isolation, fixing panel and detectors, cabling, dead and live tests, programming.Category: Electrical
Method StatementFREEPDFJustified Live Electrical Work Method StatementDownload a justified live electrical work method statement: justification, written authorisation, insulated tools, screening, accompanied work, restoring.Category: Electrical
Method StatementFREEPDFLighting & Downlight Installation Method StatementEnsure safe, compliant lighting and downlight installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFLightning Protection System Installation Method StatementDownload a lightning protection installation method statement: safe access, air terminals and conductors, earth electrodes, bonding, testing, records.Category: Electrical
Method StatementFREEPDFLow Voltage Cable Jointing and Termination Method StatementDownload a low voltage cable jointing and termination method statement: safe isolation, cable preparation, resin joints, terminations and testing.Category: Electrical
Method StatementFREEPDFLow Voltage Switchgear Operation and Maintenance Method StatementDownload an LV switchgear operation and maintenance method statement: outage and permits, switching, isolation, servicing, protection tests, restoring.Category: Electrical
Method StatementFREEPDFMain Earthing and Protective Bonding Upgrade Method StatementDownload an earthing and bonding method statement: survey and agreement, safe isolation, fitting conductors and clamps, labelling, continuity and live testing.Category: Electrical
Method StatementFREEPDFMains Smoke and Heat Alarm Installation in Homes Method StatementDownload a mains smoke alarm installation method statement for homes: alarm positions, safe isolation, interlinked wiring, testing and certification.Category: Electrical
Method StatementFREEPDFMotor and Control Panel Installation Method StatementDownload a motor and control panel installation method statement: isolation and lock-off, lifting, cabling, termination, dead tests and commissioning.Category: Electrical
Method StatementFREEPDFNew Circuit Installation in Homes Method StatementDownload a new circuit installation method statement: route and asbestos checks, cable and containment, accessories, safe isolation, testing and certification.Category: Electrical
Method StatementFREEPDFNurse Call System Installation Method StatementDownload a nurse call system installation method statement for care homes: access and infection control, cabling, call points, isolation and testing.Category: Electrical
Method StatementFREEPDFOutbuilding and Garden Power Supply Installation Method StatementDownload an outbuilding power supply method statement: route survey, services scan, trench, armoured cable, consumer unit, earthing, testing, certificate.Category: Electrical
Method StatementFREEPDFOutdoor Socket and External Light Installation in Homes Method StatementDownload an outdoor socket installation method statement: agreeing positions, safe isolation, drilling and cable routing, fitting accessories, testing.Category: Electrical
Method StatementFREEPDFOverhead Line Construction and Maintenance Method StatementDownload an overhead line construction and maintenance method statement: safety documents, pole testing, isolation and earthing, poles and conductors.Category: Electrical
Method StatementFREEPDFPlanned Electrical Maintenance Method StatementDownload a planned electrical maintenance method statement: outage planning, permits, safe isolation, inspection and servicing, dead and live testing.Category: Electrical
Method StatementFREEPDFPond, Pool and Fountain Electrical Installation Method StatementDownload a pond and pool electrical installation method statement: zones and design, isolation, supply cable, pumps and lights, bonding, testing.Category: Electrical
Method StatementFREEPDFPortable Appliance Inspection and Testing Method StatementDownload a PAT testing method statement for portable appliances: equipment list, user checks, visual inspection, testing, labelling and failed items.Category: Electrical
Method StatementFREEPDFPortable Generator Use on Site Method StatementDownload a portable generator use method statement for sites: siting, pre-use checks, safe refuelling, earthing and RCD protection, running and shutdown.Category: Electrical
Method StatementFREEPDFPublic Address and Voice Alarm System Installation Method StatementDownload a public address and voice alarm installation method statement: survey, cabling, speakers and racks, mains connection, zone testing.Category: Electrical
Method StatementFREEPDFRoof-Mounted Solar PV Installation Method StatementDownload a roof-mounted solar PV installation method statement: survey, scaffold and edge protection, lifting panels, rails, DC cabling, inverter, tests.Category: Electrical
Method StatementFREEPDFSafe Isolation and Lock-Off Method StatementDownload a safe isolation and lock-off method statement: identifying circuits and supplies, permission, isolating, notices, proving dead and restoring.Category: Electrical
Method StatementFREEPDFSecond Fix Electrical Installation Method StatementEnsure safe, compliant second fix electrical installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFSocket & Switch Installation Method StatementEnsure safe, compliant socket and switch installation with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFSolar PV System Maintenance Method StatementDownload a solar PV maintenance method statement: system records, safe roof access, AC, DC and battery isolation, panel inspection, cleaning and testing.Category: Electrical
Method StatementFREEPDFStandby Generator Installation Method StatementDownload a standby generator installation method statement: siting, lifting into position, changeover switch, earthing, cabling, load test, commissioning.Category: Electrical
Method StatementFREEPDFStreet Lighting Column Installation and Maintenance Method StatementDownload a street lighting column method statement: traffic management, services and excavation, lifting columns, connection, lanterns and testing.Category: Electrical
Method StatementFREEPDFSurge Protection Device Installation Method StatementDownload a surge protection device installation method statement: design checks, safe isolation, mounting and connecting devices, testing, labelling.Category: Electrical
Method StatementFREEPDFTemporary Electrical Supply & Site Electrics Method StatementEnsure safe, compliant temporary electrical supply and site electrics with our Method Statement Template. Fully editable and BS 7671-compliant—create yours online in minutes.Category: Electrical
Method StatementFREEPDFTesting and Certification of New Electrical Work Method StatementDownload an electrical testing and certification method statement: design check, inspection, dead tests, live tests, certificates and notification.Category: Electrical
Method StatementFREEPDFThermographic Survey of Electrical Installations Method StatementDownload a thermographic survey method statement for electrical installations: scope and load, client access, opening panels, thermal imaging, reports.Category: Electrical
Method StatementFREEPDFThree-Phase Power Installation Method StatementDownload a three-phase power installation method statement: load and supply checks, safe isolation, submains, connections, phase rotation and testing.Category: Electrical
Method StatementFREEPDFTraffic Signal Installation and Maintenance Method StatementDownload a traffic signal installation method statement: traffic management, ducts and chambers, cabinet and cables, isolation, signal heads, commissioning.Category: Electrical
Method StatementFREEPDFTV Aerial and Satellite Dish Installation Method StatementDownload a TV aerial and satellite dish installation method statement: survey, safe access, brackets, cabling, alignment and signal testing on site.Category: Electrical
Method StatementFREEPDFUnderground Power Cable Laying Method StatementDownload an underground cable laying method statement: services scan, trial holes, trench support, cable drums, laying, backfill, termination and tests.Category: Electrical

How to choose the right method statement template

  1. Find the right work type

    Search or browse the catalogue for the specific task — electrical, asbestos, hot works, working at height, scaffolding, roofing, concrete, and more.

  2. Open the template

    Click "Create" to open the method statement in our free interactive editor.

  3. Customise the work sequence and controls

    Adjust the sequence of work, equipment list, PPE, hazard register, and named responsible persons for your specific site and task.

  4. Download as a PDF (or pair with a risk assessment for full RAMS)

    Download as a professional method statement PDF, or pair with a matching risk assessment template to produce a complete RAMS document.

Frequently asked questions

Are these method statement templates really free to download?

Yes — completely free. Over 71 free UK method statement templates, free to use forever, no paywall. Customise to your task and download as a professional HSE-compliant PDF.

What is a method statement?

A method statement is a detailed document describing how a specific task will be carried out safely. It identifies the hazards, control measures, sequence of work, equipment used, PPE required, and the named persons responsible.

What is a RAMS document?

RAMS stands for Risk Assessment and Method Statement — a combined document that pairs the hazard-and-controls analysis (risk assessment) with the task-by-task work plan (method statement). UK construction commonly requires RAMS for high-risk activities.

What's the difference between a method statement and a RAMS document?

A method statement covers the "how" — the safe work plan. A RAMS document is broader: it combines the method statement with a risk assessment for the same task. Many UK clients ask for RAMS specifically for high-risk work.

Do you have a method statement template for electrical works?

Yes. We have multiple electrical method statement templates — general electrical installation, first-fix and second-fix electrical, socket and switch installation, consumer unit / fuse board installation, electrical testing and inspection, EV charger installation, temporary site electrics, and more.

Can I download method statement templates in PDF or Word format?

Every method statement template downloads as a professional PDF. Standard and Pro plans also unlock Word (.docx) export for further editing in Microsoft Word.

Do you have method statement templates for asbestos removal?

Yes. Our asbestos removal and management method statement template aligns with the Control of Asbestos Regulations 2012 (CAR 2012) and HSE guidance for licensed and non-licensed asbestos work.

Are these method statement templates HSE-compliant?

Yes. Every template aligns with HSE guidance, the Construction (Design and Management) Regulations 2015 (CDM 2015), and other relevant UK regulations (Work at Height 2005, COSHH 2002, CAR 2012 for asbestos, etc.) depending on the task.

How do I customise a method statement template to my specific task?

Open the template in our interactive generator and edit the sequence of work, equipment list, PPE requirements, hazard register, and named responsible persons to match your specific site and task.

Do you have method statement templates for hot works?

Yes. Our hot works / welding / cutting / grinding method statement template covers the controls required to manage fire risk, exposure to fumes, and contact hazards during hot work activities.

Can I download these method statements as RAMS?

Yes. Use the method statement template alongside a matching risk assessment template to build a complete RAMS document for your client. Our generators support combining them into one downloadable PDF.